Bridge Beams Set for Sample Road over I-69 Southbound (Video)

Screenshot 2017-07-22 11.58.46Yesterday, the 4 beams were set for portion of the Sample Road interchange that will go over I-69 southbound. The northbound beams will be set at a later date.

While I’m sure that watching road construction is like watching paint dry for most people, beam setting is really a pretty impressive and precision operation, involving 2 cranes.

Here is a video I made of the operation from my drone. I did my best to condense 2 hours of work into a 9 minute video:

Beam Setting at Sample Road
Click the Image for the Video

 

Thank you very much to INDOT and Keramida (engineering firm) for allowing me to film this operation from my drone safely. In particular, thanks to Sandra Flum, Mark Flick, and Bruce Winningham.

Here is a map that shows approximately where the beams were set:

Screenshot 2017-09-09 07.48.54
Sample Road and State Road 37 (Future I-69)

The beams were set for the bridge over the future southbound lane, which is west of the existing southbound lane. The northbound lane will become a frontage road and the current southbound lane will become the future northbound lane in this area.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s